If you are trying to generate a Report in LMN Time and your font has changed or doesn't look correct, that means that an emoji has been entered on the task notes.

How to Fix via Admin Login: 

We will need to delete the emoji off of that timesheet:

  1. In LMN Time, Click on TIME at the top of the screen
  2. Find the timesheet that you need to change the Task Note on and click on it
  3. If the timesheet has been submitted, you might need to put it back into progress (to do that, click on the pencil icon at the bottom on the screen) and click OK
  4. Click on the MAGNIFYING GLASS icon
  5. Click on the NOTES tab
  6. Remove the emoji and click SAVE
  7. Re-run the same report and it should be fixed